一直以来,方远将科技进步和技术创新看作企业发展的命脉。2006年,公司设立了信息技术部、商务技术部、工艺技术部、工程技术部以及焊接技术部。
In 2006, the company established information technology department, business technology department, critical technology department, engineering technology department and welding technology department.
至今,技术中心已经完成了许多的工程设计,例如,迪士尼大型交通枢纽候车廊、阿里巴巴一期、二期展示中心展示中心改造等。涵盖了钢结构中的相关新技术,新工艺分析、研发、钢结构工程方案设计、图纸分解和质量控制分析等技术解决了公司在运营时所遇到的众多技术难题,**了公司承接的高难度项目能够顺利实施和完成。(如W酒店高难度异性景观等)
Now,technology center has done a lot of engineering design, for example, the Disney stage 1 2 large transport hub waiting corridor alibaba exhibition center exhibition center renovation covers the steel structure of the related new technologies, such as research and development of new technology analysis and quality control of steel structure engineering design drawings decomposition analysis technology has solved the company of many technical problems encountered during operation, ensure the company to undertake the difficult project smooth implementation and completion (e.g., W difficult heterosexual landscape, etc.)
同时,公司技术中心还与同济大学,邀请钢结构加固吴善能教授与公司设计人员共同承担钢结构研究课题及钢结构设计的任务。
技术中心部分风采